Archive for March, 2010

Finally a night without heating.

by: Gromett March 19, 2010

Last night was the first night this year that the heating was not needed and didn’t automatically switch on.   Fantastic news for the Gas Bills.

Kitchen Worksurface in… Sort of.

by: Gromett March 16, 2010

I am still feeling run down and getting out of breath easily today due to last weeks cold but I cracked on and managed to get the kitchen work surface installed.  After it was in I realised that it is too long and I can’t get the end panels on so tomorrow I will be [...]

Longer Break than I wanted

by: Gromett March 16, 2010

Due to a variety of reasons I have not been able to do anything on the Bus since the 5th.  I will be starting again tomorrow. I want to get the Kitchen worksurface and the bench seating installed tomorrow at the minimum.  I also want the proper bed boards put in. I am going to [...]

More done today

by: Gromett March 4, 2010

Well the supplies arrived at 2pm today but I was missing the kitchen Worktop which will be delivered on Tuesday. I lifted the floor next to the bed and got the insulation down,  unfortunately 50mm insulation is too big to go all the way under the bed so the front is only partially insulated at [...]

Final big order placed

by: Gromett March 3, 2010

I have placed the final big order for materials today including the kitchen work surface.  It will be arriving tomorrow and I can make a last push to finish the internal structure. When trying to describe where abouts on the build I am at the moment I use the terms, Structure, Infrastructure and finishings.  By [...]