Archive for February, 2011
by: Gromett
February 23, 2011
I currently have a small Orange phone on contract, An orange Dongle and a Blackberry on O2. It is a bit of a nightmare to manage and my normal phone is starting to get frayed around the edges and O2 Keep messing up the Blackberry billing. I decided enough was enough and bought myself a [...]
by: Gromett
February 21, 2011
That didn’t take as long as expected. I just had to cut the corners out which were rounded for the previous window. It took a bit of trimming as well but then it slotted in and screwed together in a few minutes. I love the new look.
by: Gromett
February 21, 2011
I have cut the worksurface to size and installed the hob/burner unit. This is now on the front seat of the van. I am moving onto fitting the new window. These two jobs mean that tomorrows strip down of the kitchen and insulating it all will go much quicker.
by: Gromett
February 19, 2011
I lost my wallet last week and it put a hold on any work I wanted to do. Got the new card on Friday and a quick trip to Magnums I bought a new sink and sliding window for the side door. I now have all the parts except the wall lining so this week [...]
by: Gromett
February 8, 2011
The remaining jobs on my immediate list are as follows; Make box and face for over cab space. Strip out side panels and upgrade insulation, this is mainly on sliding door side between cab and door. Re-insulate ceiling in shower area and rear compartment. Cut all new ply panels for ceiling and walls. (the ceiling [...]