Water leak, oh sh%t

by: Gromett May 11, 2010

Just got some new gas cylinders today, switched boiler back on and water pump.  Came back to it after half an hour to see a moist patch under the boiler and a separate puddle under the water pump itself.  some investigation required there I think.

Door Installed

by: Gromett May 11, 2010

Finally got the door installed.  Just need to varnish it and add bolts and handles. The left hand panel will be covered.

Full day of hard work today

by: Gromett May 10, 2010

My friend with the Joinery business kindly let me have a workbench today and the run of his workshop.  It has taken my 9 hours but I have finally finished the entry way door to replace this mess.

Computer cupboard doors finished.

by: Gromett May 9, 2010

Well almost. The middle shelf needs raising by 1/4 of an inch to allow the door catches to lock properly.  Once that is done it is time to varnish the wood. The spaces on the left and the right hand side will be used to mount the speaks for the computer and at the top [...]

A full rebuild in less than a month.

by: Gromett May 8, 2010

On the 12th of April I went to Magnums to get the MDF boards and we pretty much rebuilt the Bus from there.  Here are some photo’s of the progress. This was the next stage on the previous build. We got a little bit more installed than this but I didn’t take any photos. Next [...]