A little more progress


Just stripped down the shower cubicle (didn’t really want to do that) to paint the window side. I have applied 1 coat and will apply the second tomorrow.

It should only take around an hour to dry then I can reassemble it and start on the boiler. Falling behind the new schedule already…..

The bus is now packed to the gills with stuff so moving around is increasingly difficult. It should ease up some once the boiler, water tank and bed base is finished as I can then use under the bed as storage.  Until then I am stepping over stuff and cursing a lot.  I think my first task tomorrow after the paint has been applied is to tidy everything up and sweep the floor.