Floor layed and first part of shower done


Thanks to Al we managed to get quite a bit done today,  The bed was removed and the floor layed.  We also build up half of the entrance steps making the living area bigger.

We got one side and the rear wall of the shower installed as well.

Today I am working on flooring the shower area and boxing in the cupboard for the boiler and airing cupboard.  I am actually thinking of putting the boiler under the bed and having the gas bottles internally at the front of the  bus.  I wasn’t keen on this idea initially as I have the boiler on all the time for hot water and this will make the bed very warm in the summer.  However it will allow me to keep all the pipework very short and increase the leisure space at the back of the bus.  I will think about this and make a decision tomorrow.